2/6/17
- 884684
- Feb 7, 2017
- 1 min read
This past week the biotech group buckled down and got loads of work done. We had been slacking off lately and our project manger got on our case about it (creds to Katie). We continued to learn how the bonding agent holds and developed a future plan. We had originally constructed an entire chamber but when we did a quick test with water, it failed. In other words the sides were not sealed enough and water was able to leak through. We also drilled holes in the chamber lid side and chamber long side to insert the banana plugs for wiring. We also cut out pieces of Plexiglas for 4 chambers.
The entire group worked on 21st century skill 6A (plan and prioritize goals). We have been behind lately but that is no more!

Comentarios